Tigray Resources Inc. is pleased to announce diamond drill results from Phase 2 drilling at the Mato Bula discovery at Adyabo (refer to Tigray’s news release dated July 16, 2013 for Phase 1 drill results). Six additional holes (WMD007 to 012) have been completed, totalling 1,117 metres. Drilling on 80 metre sections targeted extensions to mineralization defined during the Phase 1 diamond drilling campaign (WMD002 to 006). This drilling has extended Upper Lode mineralization to depth over 150 vertical metres below surface, and to 80 metres extensions at both the northern and southern extents of existing drill intersections. Eleven diamond drill holes have now tested the system over a 640 metres strike.
By Market Watch
i want to work with you
about ethiopian commodity exchange
I am very interesting to work with you. Specially I have a good now how about gold