Tigray Resources Inc. is pleased to announce diamond drill results from Phase 2 drilling at the Mato Bula discovery at Adyabo (refer to Tigray’s news release dated July 16, 2013 for Phase 1 drill results). Six additional holes (WMD007 to 012) have been completed, totalling 1,117 metres. Drilling on 80 metre sections targeted extensions to mineralization defined during the Phase 1 diamond drilling campaign (WMD002 to 006). This drilling has extended Upper Lode mineralization to depth over 150 vertical metres below surface, and to 80 metres extensions at both the northern and southern extents of existing drill intersections. Eleven diamond drill holes have now tested the system over a 640 metres strike.

By Market Watch

More Details

3 comments on “Tigray Intersects 28.2 Metres at 8.50 Grams per Tonne Gold at Mato Bula, Adyabo Project

Leave a Reply

Your email address will not be published. Required fields are marked *